feat: add rsync-compatible --fsync #248

Closed
TapTap wants to merge 0 commits from feat/fsync into dev
Owner

Implement rsync-compatible --fsync for received files. Sync completed data and metadata before in-place completion or atomic temporary-file publication, and clean up unpublished temporary files on errors. Add CLI/config wire coverage and secure writer tests.

Implement rsync-compatible --fsync for received files. Sync completed data and metadata before in-place completion or atomic temporary-file publication, and clean up unpublished temporary files on errors. Add CLI/config wire coverage and secure writer tests.
TapTap added 1 commit 2026-09-03 18:28:10 +02:00
feat: add rsync-compatible fsync
CI / lint (pull_request) Successful in 12s
CI / sanitizers (address) (pull_request) Successful in 40s
CI / sanitizers (undefined) (pull_request) Successful in 38s
CI / fuzz-build (pull_request) Successful in 14s
CI / coverage (pull_request) Successful in 31s
CI / build-and-test (pull_request) Successful in 1m15s
CI / valgrind (pull_request) Successful in 33s
4982e15969
TapTap added 1 commit 2026-09-03 22:29:43 +02:00
test: cover configured fsync save path
CI / lint (pull_request) Successful in 11s
CI / sanitizers (address) (pull_request) Successful in 37s
CI / sanitizers (undefined) (pull_request) Successful in 37s
CI / fuzz-build (pull_request) Successful in 14s
CI / coverage (pull_request) Successful in 31s
CI / build-and-test (pull_request) Successful in 1m15s
CI / valgrind (pull_request) Successful in 33s
2ace6416a7
Author
Owner

Merged as part of the Phase 1 rsync-compatibility batch. Content was integrated into dev sequentially via local merges with conflict resolution, then pushed to origin/dev (HEAD 48dfd5d). The incremental-skip regression found during integration (nanosecond mtime comparison at default modify-window=0) was fixed in 48dfd5d. Verification: unit tests 25/25, integration 74 passed. Closing this PR since its changes are already in dev; Gitea's merge endpoint is unavailable (2FA).

Merged as part of the Phase 1 rsync-compatibility batch. Content was integrated into `dev` sequentially via local merges with conflict resolution, then pushed to `origin/dev` (HEAD 48dfd5d). The incremental-skip regression found during integration (nanosecond mtime comparison at default modify-window=0) was fixed in 48dfd5d. Verification: unit tests 25/25, integration 74 passed. Closing this PR since its changes are already in `dev`; Gitea's merge endpoint is unavailable (2FA).
TapTap closed this pull request 2026-09-05 10:45:52 +02:00

Pull request closed

This pull request cannot be reopened because the branch was deleted.
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: TapTap/FastSync#248