feat: add rsync-compatible --chmod #244

Closed
TapTap wants to merge 2 commits from feat/chmod into dev
Owner

Summary\n\n- add validated numeric and symbolic rsync-style --chmod parsing\n- transmit the option and apply it through the existing safe metadata restore path\n- add CLI, unit, and integration coverage\n\n## Verification\n\n- unit tests: 25 passed\n- integration tests: 40 passed, 10 skipped, 1 expected XPASS\n- clang-format and cppcheck passed

## Summary\n\n- add validated numeric and symbolic rsync-style --chmod parsing\n- transmit the option and apply it through the existing safe metadata restore path\n- add CLI, unit, and integration coverage\n\n## Verification\n\n- unit tests: 25 passed\n- integration tests: 40 passed, 10 skipped, 1 expected XPASS\n- clang-format and cppcheck passed
TapTap added 1 commit 2026-09-03 17:50:06 +02:00
feat: add rsync-compatible chmod option
CI / lint (pull_request) Successful in 11s
CI / sanitizers (address) (pull_request) Successful in 36s
CI / sanitizers (undefined) (pull_request) Successful in 37s
CI / fuzz-build (pull_request) Successful in 15s
CI / coverage (pull_request) Successful in 32s
CI / build-and-test (pull_request) Successful in 1m15s
CI / valgrind (pull_request) Successful in 33s
e093a3c5b6
TapTap added 1 commit 2026-09-03 22:14:50 +02:00
fix: accept numeric chmod special bits
CI / lint (pull_request) Successful in 12s
CI / sanitizers (address) (pull_request) Successful in 38s
CI / sanitizers (undefined) (pull_request) Successful in 37s
CI / fuzz-build (pull_request) Successful in 14s
CI / coverage (pull_request) Successful in 32s
CI / build-and-test (pull_request) Successful in 1m15s
CI / valgrind (pull_request) Successful in 33s
7b4164d3ba
Author
Owner

Merged as part of the Phase 1 rsync-compatibility batch. Content was integrated into dev sequentially via local merges with conflict resolution, then pushed to origin/dev (HEAD 48dfd5d). The incremental-skip regression found during integration (nanosecond mtime comparison at default modify-window=0) was fixed in 48dfd5d. Verification: unit tests 25/25, integration 74 passed. Closing this PR since its changes are already in dev; Gitea's merge endpoint is unavailable (2FA).

Merged as part of the Phase 1 rsync-compatibility batch. Content was integrated into `dev` sequentially via local merges with conflict resolution, then pushed to `origin/dev` (HEAD 48dfd5d). The incremental-skip regression found during integration (nanosecond mtime comparison at default modify-window=0) was fixed in 48dfd5d. Verification: unit tests 25/25, integration 74 passed. Closing this PR since its changes are already in `dev`; Gitea's merge endpoint is unavailable (2FA).
TapTap closed this pull request 2026-09-05 10:45:51 +02:00

Pull request closed

Please reopen this pull request to perform a merge.
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: TapTap/FastSync#244