feat: add rsync modify-window option #238

Closed
TapTap wants to merge 0 commits from feat/modify-window into dev
Owner

Summary

  • add rsync-compatible --modify-window=NUM and -@ parsing
  • compare incremental mtimes with configured whole-second tolerance and nanosecond precision
  • add focused CLI, wire-format, timestamp, and integration coverage

Verification

  • strict build and unit tests
  • full integration tests
  • CI clang-format and cppcheck
## Summary - add rsync-compatible --modify-window=NUM and -@ parsing - compare incremental mtimes with configured whole-second tolerance and nanosecond precision - add focused CLI, wire-format, timestamp, and integration coverage ## Verification - strict build and unit tests - full integration tests - CI clang-format and cppcheck
TapTap added 1 commit 2026-09-03 17:02:00 +02:00
feat: add rsync modify-window option
CI / lint (pull_request) Successful in 14s
CI / sanitizers (address) (pull_request) Successful in 37s
CI / sanitizers (undefined) (pull_request) Successful in 38s
CI / fuzz-build (pull_request) Successful in 15s
CI / coverage (pull_request) Successful in 31s
CI / build-and-test (pull_request) Failing after 1m15s
CI / valgrind (pull_request) Successful in 32s
0b5b1a8643
TapTap added 1 commit 2026-09-03 21:54:48 +02:00
fix: address modify-window review findings
CI / lint (pull_request) Successful in 13s
CI / sanitizers (undefined) (pull_request) Successful in 38s
CI / sanitizers (address) (pull_request) Successful in 39s
CI / fuzz-build (pull_request) Successful in 14s
CI / coverage (pull_request) Successful in 31s
CI / build-and-test (pull_request) Successful in 1m16s
CI / valgrind (pull_request) Successful in 33s
e37d5b9438
Author
Owner

Merged as part of the Phase 1 rsync-compatibility batch. Content was integrated into dev sequentially via local merges with conflict resolution, then pushed to origin/dev (HEAD 48dfd5d). The incremental-skip regression found during integration (nanosecond mtime comparison at default modify-window=0) was fixed in 48dfd5d. Verification: unit tests 25/25, integration 74 passed. Closing this PR since its changes are already in dev; Gitea's merge endpoint is unavailable (2FA).

Merged as part of the Phase 1 rsync-compatibility batch. Content was integrated into `dev` sequentially via local merges with conflict resolution, then pushed to `origin/dev` (HEAD 48dfd5d). The incremental-skip regression found during integration (nanosecond mtime comparison at default modify-window=0) was fixed in 48dfd5d. Verification: unit tests 25/25, integration 74 passed. Closing this PR since its changes are already in `dev`; Gitea's merge endpoint is unavailable (2FA).
TapTap closed this pull request 2026-09-05 10:45:49 +02:00

Pull request closed

This pull request cannot be reopened because the branch was deleted.
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: TapTap/FastSync#238